Description :
Figure 5.3. The GDS CRS consolidation system includes (A) back pressure controller, (B) 50 kN load frame, (C) axial displacement transducer, (D) CRS consolidation cell, (E) submersible load cell, (F) pore pressure transducer and (G) DAQ system.